THE NETHERLANDS

Jos Reijnders RVO - Netherlands Enterprise Agency


TECHNOLOGY DEMONSTRATION


OPERATIONAL PROJECTS

52044-netherlands-1.jpg
Tocardo’s 1.25 MW demonstrator in the Eastern Scheldt barrier (left) & The 1 MW Pentair Fairbanks Nijhuis bi-directional turbine to be installed in the ‘Grevelingendam’ (right)


37542-netherlands-2.jpg
 The REDstack test facility and demonstration project at the ‘Afsluitdijk’

 

PLANNED DEPLOYMENTS

  • OTEC Pilot Curacao (500 kW)
     
  • OTEC Pilot/Demo Martinique
     
  • Tidal Energy Marsdiep (200 kW)
     
  • Tidal Test Centrum Grevelingen Barrier; several techniques
     
  • Follow up of Tocardo in Eastern Scheldt (2 MW)
     
  • Brouwers Barrier tidal range plant (after 2018, various scenarios)
     
  • Several arrays in Afsluitdijk discharge gates (further future)